Glanbia Waterford

Glanbia Waterford

Project Name: Glanbia Waterford

Main Contract: Banagher Precast Concrete and Glanbia

Contract Duration: 3 Months

Service being Provided: Installation of Fire Barriers around Service Penetrations

Project Information: Parkwest Fire Protection have been contracted by Banagher Precast Concrete and Glanbia to install a fire rated bulkhead around existing concrete beams throughout the building. These works will consist of installing Kemwell impact board around the 50x50x3ml heavy duty steel angle to create the frame. Packed with 50ml Rockwool 100kg/m3 insulation. Boarded over using a 9.5ml Kemwell impact board.